TSCA 8(a)(7) PFAS reporting rule

Chemicals and substance safety in products and supply chains.

Reporting and Recordkeeping Requirements for Certain Per- and Polyfluoroalkyl Substances, 40 C.F.R. Part 705, under Toxic Substances Control Act section 8(a)(7), 15 U.S.C. 2607(a)(7)

In force, obligations not yet applyingClaim-level sources availableBinding instrument
← Back to results

Research snapshot: 12 Nov 2026 · Check the source text before relying on this record.

Who and what is covered?

Selected coverage evidence, not a complete scope test or eligibility decision. Product coverage does not establish every company type. Read dates, exceptions and source qualifications below.

Company / activity coverage

Recorded scope evidence

The rule applies to persons who manufactured PFAS for commercial purposes at any time from 1 January 2011 through 31 December 2022.

Recorded product scope evidence

The rule applies to all chemical substances and mixtures, including articles, that are PFAS.

Some evidence is withheld pending review; this selection is incomplete.

Size & scale thresholds

Unknown — no display-available company-size or scale threshold is recorded here. This does not mean no threshold applies.

Product concentration limits and reporting periods are not company-size tests. Historical phases, proposals and exemptions retain their stated qualifications.

In force as a rule, but the data submission period has not begun. The rule requires one-time reporting by persons that manufactured, including imported, PFAS or PFAS-containing articles for commercial purposes in any year from 2011 through 2022. The start of the submission period has been postponed three times; as codified in the eCFR edition of 29 October 2026 it begins on 31 January 2027 or 60 days after the effective date of a forthcoming final rule on the substantive requirements, whichever is earlier.

Sourced claims

5 shown; 1 held locally

Select a numbered source beside a claim to read the cited excerpt.

1 claim is held locally pending review. Details withheld pending review.

Other claims

The rule applies to all chemical substances and mixtures, including articles, that are PFAS.

Single sourceSupporting evidence recorded

Scope

The rule applies to persons who manufactured PFAS for commercial purposes at any time from 1 January 2011 through 31 December 2022.

Single sourceSupporting evidence recorded

Thresholds

A small manufacturer reporting exclusively as an article importer has a twelve-month submission period instead of six months.

Single sourceSupporting evidence recorded

Status

As codified, the submission period begins on 31 January 2027 or 60 days after the effective date of a forthcoming final rule on the substantive requirements, whichever is earlier, so it had not begun as at 12 November 2026.

Single sourceSupporting evidence recorded

EPA has postponed the start of the submission period three times: first to 11 July 2025, then to 13 April 2026, and then to a date no later than 31 January 2027.

Single sourceSupporting evidence recorded

Thresholds

  • Reporting covers any year from 1 January 2011 through 31 December 2022 in which the person manufactured PFAS for commercial purposes.
  • Small manufacturers reporting exclusively as article importers have a 12-month submission period rather than 6 months.

Milestones

current stage: In force, obligations not yet applying
11 Oct 2023
Published

Final rule published at 88 FR 70548.

13 Nov 2023
Entered into force

Final rule became effective (88 FR 70516, published 11 October 2023). The reporting window is a separate matter: as codified in the eCFR edition of 29 October 2026 the submission period begins on 31 January 2027 or 60 days after a forthcoming Federal Register notice, whichever is earlier.

5 Sept 2024
Amended

Direct final rule at 89 FR 72336 moved the start of the submission period from 12 November 2024 to 11 July 2025 because the electronic reporting application was not ready.

13 May 2025
Amended

Interim final rule at 90 FR 20236 set the submission period as 13 April 2026 to 13 October 2026, with 13 April 2027 for small article importers.

13 Apr 2026
Amended

Final rule at 91 FR 18786 replaced the fixed start date with 31 January 2027 or 60 days after the effective date of a forthcoming final rule, whichever is earlier.

31 Jan 2027
Obligations apply · scheduled

Backstop date on which the submission period begins if the forthcoming final rule has not set an earlier start.

Conditional and future milestones are shown but never set the current stage. A scheduled sunset is not a repeal that has happened.

What we could not establish

  • The date on which the submission period will actually begin is not fixed: it depends on a forthcoming final rule on the substantive requirements, with 31 January 2027 as a backstop. Whether that final rule had issued by 12 November 2026 was not established.
  • The substantive revisions proposed on 13 November 2025 (90 FR 50923) and their final outcome were not read.
  • The full list of information elements required by 40 CFR 705.15 was not read.

A free resource, made for you

We’d love for you to explore the full resource. Please enter your email to continue—it helps us understand who finds this useful.

Just once on this browser. No account or password needed.

We’d love a little feedback. No feedback yet? Just leave this blank.

Entering your email doesn’t sign you up for marketing updates.